Typical stages involved
to form a wet room or walk in shower:
Site visit to assess the clients
requirements of area. General meeting to discuss electrical cabling,
pipe work access, fixtures, fittings, floor coverings- wall type
and any unforeseen events that might get over looked.
Upon acceptance of quotation a
50% deposit is required before any work commences.
Strip out bathroom removing any
wall/floor tiles, baths, pipe work pedestals. Make good to walls.
Cut out sub floor to accommodate
shower tray, remove install pipe work and necessary pumps.
to be cont..
|